The is a concrete arch-gravity dam on the Tadami River, southwest of Tadami in Fukushima Prefecture, Japan. The primary purpose of the dam is hydroelectric power generation and it supports a 182 MW power station. The power station contains two Kaplan turbine-generators. Unit 1 (95 MW) was commissioned on 20 November 1963 while Unit 2 (87 MW) was commissioned on 7 June 2003 as part of a power plant expansion project that included an additional 200 MW generator at Okutadami Dam upstream. The dam is tall and long. Its reservoir has a capacity of which is active (or "useful") for power generation. The reservoir has a catchment area of and surface area of . Of the two generators, Unit 1 has a maximum effective hydraulic head of and Unit 2 is afforded . The design flood discharge of the dam is and its service spillway is controlled by three tainter gates. ==See also==
*List of power stations in Japan *Tagokura Dam – located downstream
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Otori Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|